KENO V.a Primer: Performing Calculations using SCALE’s Criticality Safety Analysis Sequence (CSAS5) with Fulcrum... ORNL Report December, 2020
KENO-VI Primer: Performing Calculations using SCALE’s Criticality Safety Analysis Sequence (CSAS6) with Fulcrum ORNL Report December, 2020
Verification of Nek4nuc (Nek5000 Integrated in NEAMS Workbench) via Turbulent Pipe Flow Simulation Conference Paper November, 2020
Feasibility Study for a Proposed Subcritical Assembly at Oak Ridge National Laboratory Conference Paper November, 2020