Skip to main content
SHARE
Publication

Lifetime Prediction of IGBT in a STATCOM Using Modified-Graphical Rainflow Counting Algorithm

by Lakshmi Reddy Gopi Reddy, Leon M Tolbert, Burak Ozpineci
Publication Type
Conference Paper
Book Title
IECON 2012 - 38th Annual Conference on IEEE Industrial Electronics Society
Publication Date
Page Numbers
3425 to 3430
Conference Name
IECON 2012 - 38th Annual Conference on IEEE Industrial Electronics Society
Conference Location
Montreal, Canada
Conference Date
-

Rainflow algorithms are one of the best counting methods used in fatigue and failure analysis [17]. There have been many approaches to the rainflow algorithm, some proposing modifications. Graphical Rainflow Method (GRM) was proposed recently with a claim of faster execution times [10]. However, the steps of the graphical method of rainflow algorithm, when implemented, do not generate the same output as the four-point or ASTM standard algorithm. A modified graphical method is presented and discussed in this paper to overcome the shortcomings of graphical rainflow algorithm. A fast rainflow algorithm based on four-point algorithm but considering point comparison than range comparison is also presented. A comparison between the performances of the common rainflow algorithms [6-10], including the proposed methods, in terms of execution time, memory used, and efficiency, complexity, and load sequences is presented. Finally, the rainflow algorithm is applied to temperature data of an IGBT in assessing the lifetime of a STATCOM operating for power factor correction of the load. From 5-minute data load profiles available, the lifetime is estimated to be at 3.4 years.