Abstract
One of the challenges faced during the analysis of various disturbances with inverter-based resources is the ability to replicate the same disturbance in simulations. The main issue arises from lack of electromagnetic transient (EMT) models and adequate fidelity of models. To overcome this problem, in this paper, EMT simulation of power grid and one of the affected photovoltaic (PV) plants is performed to replicate the observations during the Angeles Forest disturbance in 2018. The processes to (i) develop the EMT model of the power grid from traditional transient stability (TS) data, and (ii) develop high-fidelity EMT model of PV plant from data collected on a PV plant are described in the paper. The requirements in the high-fidelity EMT model of the PV plant are also described. Finally, simulation of the Angeles Forest disturbance is performed and similar simulation results (as compared to the observed disturbances) are observed.