Skip to main content
SHARE
Publication

STATUS OF THE SPALLATION NEUTRON SOURCE SUPERCONDUCTING RF FACILITIES...

Publication Type
Conference Paper
Publication Date
Page Numbers
1193 to 1195
Conference Name
Particle Accelerator Conference 2007
Conference Location
Albuquerque, New Mexico, United States of America
Conference Date
-

The Spallation Neutron Source (SNS) project was completed with only limited superconducting RF (SRF) facilities installed as part of the project. A concerted effort has been initiated to install the infrastructure and equipment necessary to maintain and repair the superconducting Linac, and to support power upgrade research and development (R&D). Installation of a Class10/100/10,000 cleanroom and outfitting of the test cave with RF, vacuum, controls, personnel protection and cryogenics systems is underway. A horizontal cryostat, which can house a helium vessel/cavity and fundamental power coupler for full power, pulsed testing, is being procured. Equipment for cryomodule assembly and disassembly is being procured. This effort, while derived from the experience of the SRF community, will provide a unique high power test capability as well as long term maintenance capabilities. This paper presents the current status and the future plans for the SNS SRF facilities.